PA.NO.RA.MA
the valley bridge
year : 2020

Project : 2 Hours Design Challenge
Location : Fictional
Status : Assignment
--This project was made within 2 hours as a bridge design challenge. Made with a combination of modern materials such as steel and bamboo as traditional materials. This bridge is an extension of the area to get a maximum panorama or natural view at the end of the cliff.--
The Entrance
Sitting Area
The Exit
PA.NO.RA.MA
Published:

Owner

PA.NO.RA.MA

PA.NO.RA.MA is a cliff architectural design solutions.

Published: